TATOR

New member
I am installing a 100 amp service to an agricultural building. I'm running conduit down a telephone pole to the meter base then conduit underground
to a service disconnect on the outside of the building. Then to a 100 amp load center. Do I need an earth ground at the meter base and the disconnect? Also from the inside panel?
 
The utility will likely require a grounding electrode at the meterbase.

The structure's grounding electrode system would begin at the service disconnect.
 