elektrisista
Member
- Location
- Westchester NY
Hola folks, I?m a bit rusty ( been out of the field for a while? stumbling back in)
I recently completed a renovation and the service is in need of an upgrade (200A calculated). There is an existing main disconnect on the exterior of the house I?m hoping to do away with if possible. I?m not entirely certain how to determine the necessary distance between the meter and main panel before a disconnect is required.
I can pretty much make a straight run from the back of the meter pan through the side wall of the structure and into the panel located in a mechanical room with 9 feet of pipe (rigid conduit and main panel will both be surface mounted upon entrance)
Do I need a service disconnect, and what are some of your initial thoughts when determining whether a disconnect is required when distances are questionable?
I recently completed a renovation and the service is in need of an upgrade (200A calculated). There is an existing main disconnect on the exterior of the house I?m hoping to do away with if possible. I?m not entirely certain how to determine the necessary distance between the meter and main panel before a disconnect is required.
I can pretty much make a straight run from the back of the meter pan through the side wall of the structure and into the panel located in a mechanical room with 9 feet of pipe (rigid conduit and main panel will both be surface mounted upon entrance)
Do I need a service disconnect, and what are some of your initial thoughts when determining whether a disconnect is required when distances are questionable?