That is what our utility requires. You supply the schedule 80 PVC riser and the utility installs it and the wire up the pole.I have pulled the underground to the pole with a 90 at the base of the pole and enough wire to get where you need to go. Then slide the riser down over the wires assuming it is pVC
But dealing with 750s and if a metal raceway that is another story
timber hitch choking the pole 5' above the top of the riser, with a clevice holding a large greenlee pulling wheel.Anyone have suggestions / ideas with pics showing pulling wire up utility pole for service riser. Need to pull 3-750 Alu