Looking at a job with several sets of duct banks with 500 mcm. Run is about 500'. Wire to be pulled out and conduit abandoned.
Anyone ever have a job like this? Ive heard that sometimes removing wire in this situation could take a lot longer than installing depending on certain factors. How they heck could you anticipate these unforeseen conditions and labor it accurately?
Could someone briefly describe the steps involved to remove wire in this situation? Thanks a lot!!
Anyone ever have a job like this? Ive heard that sometimes removing wire in this situation could take a lot longer than installing depending on certain factors. How they heck could you anticipate these unforeseen conditions and labor it accurately?
Could someone briefly describe the steps involved to remove wire in this situation? Thanks a lot!!