petersonra
Senior Member
- Location
 - Northern illinois
 
- Occupation
 - Semi-retired engineer
 
I was looking for something the other day that I was unable to find. 
I seem to recall there is a requirement that an EGC of the wire type be run from a hazardous area all the way back to the main or system bonding jumper.
I am unable to find this requirement now, so I am thinking maybe I imagined it.
Any thoughts where I might look? or did I imagine it?
	
		
			
		
		
	
				
			I seem to recall there is a requirement that an EGC of the wire type be run from a hazardous area all the way back to the main or system bonding jumper.
I am unable to find this requirement now, so I am thinking maybe I imagined it.
Any thoughts where I might look? or did I imagine it?
				