ICPete
Member
- Location
- Prescott Valley AZ
- Occupation
- Engineer
I should clarify: I'm not going to be installing this myself, but before I hand the plans to the electrician, I'd like to make sure it will work with the placement of the boxes and conduits as I'm drawing it up. There are also a couple of meter sockets for production meters, and those I can specify, of course, in top feed or undergound feed variations. The need to route the conduits into the safety switches a certain way will affect the relative heights and placement of all the boxes.