I'm wiring a pole building with commercial girts (basically horizontal studs). The way that it is built, the 2x6 girts are off set to the outside of the 6x6 frame posts by 1 1/2 inches so that they line up with the trusses which creates a flat surface for the sheet metal siding to lay against. Because of this there is a 1 1/2 space between the siding and the posts. My question is this- Can I run the romex along the girts as normal and then run it through that space (around the post) instead of drilling a hole clear through it? I know from the inside there must be at least 1 1/4 space from romex hole to edge. What about exterior side? If someone were to drill/nail from the outside they would know there is nothing solid behind the sheet metal at the post until they penetrate 1 1/2 inches and you can clearly see the rows of screws. What do you think?