george t. everett
Senior Member
- Location
- New York
Article 680.23(F)(1) of the 2005 NEC allows MC cable, where installed within buildings, to supply pool lights. Does 680.23(F)(2A) allow the EGC to be spliced in a junction box at the point where the MC changes to conduit as it leaves the building? If so, what means can be used to make this splice?