rojay
Senior Member
- Location
- Chicago,IL USA
The building GES consists only of two ground rods located outside at the service equipment location. Transformer is inside, but since the service is in close proximity, my thought was to drive the rods for the xfmr outside. It will be a short distance to bond to the existing rods. I just wasn’t positive if additional rods were needed.