clients requested in their lease 400A 120/208v 3ph, 4w service for their facility. So you provide a 400A service. The question..... are they really getting 400A. Do they know that they are responsible for loading up their electrical needs to 80 percent of that breaker or fuse main. If the client was requesting 7 watts per sq. ft. and 400A met that and if their limited to 80 percent of the mains. Than actually they are getting 5.6 watt per sq.ft. Is that correct.
sq. footage is 20571'.
Thanks
sq. footage is 20571'.