That stuff is intended to be buried to feed the site.
In your opinion.
IMO I'll use it anyway the code allows me too.:wink:
That stuff is intended to be buried to feed the site.
In your opinion.
IMO I'll use it anyway the code allows me too.:wink:
then why set the trap?i've seen the bait and im not hungry.
Personally, I'd run THHN/THWN and not struggle to pull it in to conduit.
Not really, but I can if you want. Not to many trailers in DC are there? I haven't worked on one in 20 years and I hope I never have to. :smile:
I can't argue with that except to say the boss likes to feed mobiles and manufactured homes with aluminum. Usually we buy the 3-wire Sweetbriar and add a #4 USE grounding conductor to it.
Is there a point where a manufactured home is legal to be fed via 3 wire service and a ground rod? Im going to pull four wires, but I just curious.