tschepers
Member
- Location
 - South Florida
 
installed a new 400a service, due to an existing 100a sub panel fed by a 100a auto transfer switch, the inspector wants a panel schedule with demand loads  for this panel, how do i do come up with the demand loads:-?
	
		
			
		
		
	
				
			
				