highvolts582
Senior Member
- Location
 - brick nj
 
Ok I am hooking up a Solar job doing a line tap on the line side of a main disconnect.  I have a 4/0 225 amp copper feed (not parallel) that I need to Tie in to Line the line side of a 400 amp service disconnect. Feeding this disconnect is 2 Parallel 4/0 conductors. I want to put a triple bug on my 4/0 and jump off with 2- 1/0 parallel conductors and use bite-down connectors to attach these parallel conductors to the 4/0 parallel conductors feeding this disconnect.  it will save me a disconnect reconnect not hold up job for 3 weeks and basically save my life.
Thanks,
Mike
	
		
			
		
		
	
				
			Thanks,
Mike
				
