victor.cherkashi
Senior Member
- Location
- NYC, NY
There is (15) 20A power and lighting circuits belong to tenant in house panel which I would like to meter the KWH.
My plan is to install KWH meter with remote current transformers in metal enclosure. All circuits of phase-A go thru 1st C/T, all circuits of phase-B go thru 2nd C/T, all circuits of phase-C go thru 3rd C/T.
I say it should work fine, but some of my colleagues say they are not sure about correct KWH metering.
What is you opinion? Does anyone see a possible problem with the correct KWH metering?
Thank you in advance
My plan is to install KWH meter with remote current transformers in metal enclosure. All circuits of phase-A go thru 1st C/T, all circuits of phase-B go thru 2nd C/T, all circuits of phase-C go thru 3rd C/T.
I say it should work fine, but some of my colleagues say they are not sure about correct KWH metering.
What is you opinion? Does anyone see a possible problem with the correct KWH metering?
Thank you in advance