Just guessing here, but-
the derived phase doesn't exist until the RP is up to speed?
starting what's basically two motors at once?

and the FAQ says so :):
Is it necessary for the Roto-Phase to start first?
Yes. It must be up to speed (two to three seconds) before any three phase load is applied.
(in http://www.arco-electric.com/FAQ.aspx)
Different brand but close enough. Easy enough to do.
Thank you.
 
Don’t remember the brand of the ones I installed, but yes, the instructions required Uou to run the RPC until it came up to speed before load was added.

There was a bit of a start up procedure for one that I installed that I had to go through with the owner. 🤣
 