I was asked to hard wire a three-phase generator for a city septic system. It is currently hooked up with a so cord. The generator has three phase wires with a chassis ground, in the service the ground is connected ground with a neutral being derived there.  Do, I need to try and pull a neutral from the generator? Am I calculating the wire size correct at 250kcmils.