This is a cell Tower. Single phase power coming in this is the neutral to enclosure bond. The two screws are missing. I want to tell you what I'm thinking and get feedback please.
I'm thinking of cleaning the mating surfaces with some fine sand paper and applying some dielectric grease between the surfaces before putting in new grounding screws. 8 may have to tap it to a larger size if they are stripped.
Thanks.
I'm thinking of cleaning the mating surfaces with some fine sand paper and applying some dielectric grease between the surfaces before putting in new grounding screws. 8 may have to tap it to a larger size if they are stripped.
Thanks.