zemingduan
Senior Member
- Location
- Philadelphia,PA
- Occupation
- Electrical Designer
It is a 4-story multi-family building with solar panels and inverters on the roof. The PV system A/C disconnect will be located on the exterior wall next to the building electrical service equipment/disconnect and utility meters. After the PV A/C disconnect, the A/C wiring will run inside the building to the indoor house panel and interconnect with the system at the house panel.
My question is that, does NEC requires the A/C wiring between the inverter to the PV system A/C disconnect to run outside the building? Can you run it inside? If yes, do you need additional disconnect at the entrance point?
Thanks!
My question is that, does NEC requires the A/C wiring between the inverter to the PV system A/C disconnect to run outside the building? Can you run it inside? If yes, do you need additional disconnect at the entrance point?
Thanks!