Power Tech
Senior Member
- Location
- Lebec, California
I have no idea what you mean by six divisions of load.
It is code compliant to have six (sometimes more) service disconnect grouped in one location at one building.
For example: Coming down the pole with overhead lines feeding 6 separate pumping panels. You need a main.
Please correct me if I am wrong.