I have an area where I am useing romex in a house.
They have a breeze way with fancy wood that goes up to an eve.
This is where they want lights.
The carpenter has already installed the wood except for the top where he wants me to put the wires. I wont have any thing to protect the wire except the carpenter telling me to put the wire in the middle where there will be a little gap. He will put the nails on the outside of the last and top piece of wood that will ajoin the eve to have a 4" flat piece on top.
From the house I am obviously going to use romex. I thought I could sleeve the romex up at the eve. It will be in lenths about 8 to ten feet before it gets to a light box, total of about 40 feet.
Am I allowed to install 14-3 romex in 1/2" emt ?
They have a breeze way with fancy wood that goes up to an eve.
This is where they want lights.
The carpenter has already installed the wood except for the top where he wants me to put the wires. I wont have any thing to protect the wire except the carpenter telling me to put the wire in the middle where there will be a little gap. He will put the nails on the outside of the last and top piece of wood that will ajoin the eve to have a 4" flat piece on top.
From the house I am obviously going to use romex. I thought I could sleeve the romex up at the eve. It will be in lenths about 8 to ten feet before it gets to a light box, total of about 40 feet.
Am I allowed to install 14-3 romex in 1/2" emt ?