Hello all,
For the new options to calculate the Maximum Photovoltaic Source and Output Circuits 690.7(A), can anyone point me in the right direction of what option 3 is stating:
(3) For PV systems with a generating capacity of 100 kW or greater, a documented and stamped PV system design, using an industry standard method and provided by a licensed professional electrical engineer, shall be permitted.
Specifically what does "industry standard method" mean? Does this mean a modeling software?
Thanks,
Michael Camacho, P.E.
For the new options to calculate the Maximum Photovoltaic Source and Output Circuits 690.7(A), can anyone point me in the right direction of what option 3 is stating:
(3) For PV systems with a generating capacity of 100 kW or greater, a documented and stamped PV system design, using an industry standard method and provided by a licensed professional electrical engineer, shall be permitted.
Specifically what does "industry standard method" mean? Does this mean a modeling software?
Thanks,
Michael Camacho, P.E.