tryinghard
Senior Member
- Location
- California
...So if you have multiple independent 20' CEE sections in each building, you are allowed to ignore all except one per building.
"equipment ground to bond additional"
No, don't bond them at all or bond them with an electrode GEC according to GEC requirements/rules.
I understand this the same, thanks!