250.96 (a)

Status
Not open for further replies.

nhfire77

Senior Member
Location
NH
501.15(C)(6) There is always more to the story. You immediately assumed no and there are variables. When the conduit seal is not specifically labeled to be used above 25%.

So now we know. When you post you will not post the entire story. Critical details will be left out. You never mentioned this. Hazardous Locations have their own section in this forum. If you don't state it is, how would we know, unless it is in that section. Your assumption that we will catch this is disingenuous.

What are you trying to prove by not giving us all the variables?, by making inflammatory statements such as:

Originally Posted by ivsenroute:

Then I suppose I had no right to fail an installation that had 12 #12 THWN wires in 3/4" RMC because it exceeded the fill requirements?

This statement does not say what fill reqirements. We are left to guess, assume actually, that it is a standard install, you make no mention of extra variables. Why would you intentionally leave this out? We are not in your head. We are not on the job site.

Please don't assume we will know the variables, and we won't assume you left any out.

No one here is trying to make this an adversarial forum.

That is the lawyers forum, one web page over.
 
Status
Not open for further replies.
Top