installed a 30 hp single to three phase converter today,dummy me did not look at the power co transformer on the pole, it is rated 15kva,converter needs at least 40kva it is a bussiness service,it trips the jack on pole upon start-up,power co wants him to put a 3 phase service in and does not want to up size the transformer,now what any ideas?