B2Buckaroo
Member
- Location
- Minnesota
- Occupation
- electrician
30a 3 phase disconnect fed from a 208 4w 30a circuit. (2 loads) phases 1 & 3 fused at 30a 208, phase 2 fused at 20a 120v. Allowing operator to lockout both components of a weld station (feeder and power supply) with a single lock. Is this NEC compliant?