ElectricVette
Member
I have a new 65'X65' Commercial repair shop that is to be feed with 480 Volt 3 Phase transformer. I don't know how to build the service. Do I go from the transformer to a 480 volt disconnect then feed a meter then feed a step down transformer that feeds the 200 amp 3 phase 120/208 panel? How big should the transformer be?