i have a stacking conveyor to hook up.
it's in a permanent location with regard to the
pivot point, but will swing in about a 270 degree arc,
as it telescopes and runs thru a program to lay aggregate
in windrows... so it'll be slowly rotating constantly, back and forth.
power requirements will dictate a 500MCM-3 conductor cord -w- ground
on 480 volts. power will be fed underground. 400 amp supply.
i'm trying to devise a cable strategy that will allow the cord to live a long
and protected life, as when there is loose material around the pivot on
the conveyor, the common thing to do is clean it out with a rubber tired
loader. and if there is 2' of gravel over this cord so you can't see it, you know
what will happen.
anyone got any experience with feeding a stacker like this? i could use suggestions.

it's in a permanent location with regard to the
pivot point, but will swing in about a 270 degree arc,
as it telescopes and runs thru a program to lay aggregate
in windrows... so it'll be slowly rotating constantly, back and forth.
power requirements will dictate a 500MCM-3 conductor cord -w- ground
on 480 volts. power will be fed underground. 400 amp supply.
i'm trying to devise a cable strategy that will allow the cord to live a long
and protected life, as when there is loose material around the pivot on
the conveyor, the common thing to do is clean it out with a rubber tired
loader. and if there is 2' of gravel over this cord so you can't see it, you know
what will happen.
anyone got any experience with feeding a stacker like this? i could use suggestions.