Cavie
Senior Member
- Location
- SW Florida
Well, 2008 is here. Are the new arc faults in the supply houses? Everybody installing them as on today? My boss has interpeted the code a little differently then the surounding areas. (nothing new). We are requiring the change as to date of permit issue 1/1/1008. So it will be a few months before I have to look for them. As BPHGRAVITY stated, they accually are required to be installed as of 1/1/08 per the 2005 NEC.