david
Senior Member
- Location
- Pennsylvania
So, how is Load Two getting power?
We are not sure since the OP did not provide enough information. A safe assumption would be that building one is existing and the solar was to supplement the utility supply to building one.
Another safe assumption would be the solar array is away from building one. Or this is a huge facility that would justify the distance in stepping up the voltages.
A third safe assumption would be that the second load is a distance away from the first building and the solar array since the OP wants to go back and tap the stepped up voltage to take the solar supply to the secound load.
My assumptions are that building one and load two are existing loads that the OP wants to supplement solar to the utility supply