raberding
Senior Member
- Location
- Dayton, OH
- Occupation
- Consulting Engineer
Hi gang
We design for retail and regularly specify "ordinary" panelboards for tenant improvements across the US. Panels like 125A and 225A MCB, 30 ckt and 42 ckt, 208/120/3, 22kaic panels. Usually loaded with 20/1 breakers, with a few 2p and 3p breakers for RTUs, water heaters, etc. Sometimes surface, sometimes flush.
Was told yesterday by an EC (for a project in DC) that panels/breakers are 60 days out. But they have a source - an independent panel fabricator who presumably anticipated this shortage, and bought over $2M in boards/breakers/tubs. And this guy can supply way earlier. But at a price. Not sure of the price adder...Does not feel right to me.
Think 60 days is real???
We design for retail and regularly specify "ordinary" panelboards for tenant improvements across the US. Panels like 125A and 225A MCB, 30 ckt and 42 ckt, 208/120/3, 22kaic panels. Usually loaded with 20/1 breakers, with a few 2p and 3p breakers for RTUs, water heaters, etc. Sometimes surface, sometimes flush.
Was told yesterday by an EC (for a project in DC) that panels/breakers are 60 days out. But they have a source - an independent panel fabricator who presumably anticipated this shortage, and bought over $2M in boards/breakers/tubs. And this guy can supply way earlier. But at a price. Not sure of the price adder...Does not feel right to me.
Think 60 days is real???
