Had a request from a new inspector that he wants sand underneath the conduits for a trench inspection.
I do not see anywhere in the code saying it has to be underneath the pipe what do you say?
And as soon as he leaves the excavator will be filling the trench with anything he wants!http://forums.mikeholt.com/images/smilies/blink.gif