I was informed today by the poco that we now can start bonding at the meter, they still dont want it inside the meter, but say it is ok to scrape some paint and mount a lug to the outside of meter for the ground rods. Does this mean that I can leave out the bonding screw in the panel and seperate grounds and neutrals? and also will the water pipe ground have to originate from the same point? I still will call poco to send something over to state the changes. This change would help cut costs for multi-unit buildings.
Thanks in advance.