Cavie
Senior Member
- Location
- SW Florida
There is an on going discussion about lockouts on DW and Disp. Also, A/H and W/H. I for one do not agree with the use of these divices. Disconects should be required. But then, I'm not in charge of such matters. However, unless you are in an industrial plant or some other safty regulated structure with some safty geru looking over your shoulder, have any of you ever accually used a lock out?. I mean, did you install a lock while you were working on the W/H of the Dishwasher?? Do the code gods really think that anyone is going to do it in a residential setting? Why not make it safe, (I think that is the purpose of the NEC) and install disconects where needed for saftey?. My rant for today!