Canadian Electrical Code Vs. NEC

Status
Not open for further replies.
How do you flush mount a service doing it the 'Canadian' way?

th
 
How do you flush mount a service doing it the 'Canadian' way?

th

It could be done just like we sometimes flush mount 21" wide panels. The carpenter has to frame for it.

Besides, you don't have to, and we are not really allowed to mount panels sideways. (We can but we could only use half the spaces due to 'up is on' requirements.)
 
It could be done just like we sometimes flush mount 21" wide panels. The carpenter has to frame for it.

Besides, you don't have to, and we are not really allowed to mount panels sideways. (We can but we could only use half the spaces due to 'up is on' requirements.)


:lol: Its fun seeing breakers reading "NO".
 
This is an industrial project; we do IEC projects all the time, but have not been involved with anything from Canada so wasn't sure if they were more similar to NEC or IEC.

As far as licensing, supposedly they allow temporary on a project by project basis, but they make you jump through hoops to get it, and then you still have to have a local engineer on board. Job protection I guess.

Looks like I have some reading to do. I'm too old to learn new things. :cry:
 
Status
Not open for further replies.
Top