ggunn
PE (Electrical), NABCEP certified
- Location
- Austin, TX, USA
- Occupation
- Electrical Engineer - Photovoltaic Systems
Is there anything in the NEC that governs the required clearance from a gas meter relief valve to a disconnecting means? All I can find in the AHJ design criteria is the required clearance from the gas valve to an electric meter, and I haven't been able to find any pertinent information in the NEC.