ggunn
PE (Electrical), NABCEP certified
- Location
 - Austin, TX, USA
 
- Occupation
 - Consulting Electrical Engineer - Photovoltaic Systems
 
Is there anything in the NEC that governs the required clearance from a gas meter relief valve to a disconnecting means? All I can find in the AHJ design criteria is the required clearance from the gas valve to an electric meter, and I haven't been able to find any pertinent information in the NEC.
	
		
			
		
		
	
				
			
				