I was in an area doing make ready engineering. while speaking with the contractor, we had a difference of opinion on clearence from the running neutral on the pole. Because it is associated with the primary lines, the proper clearence should be 6 feet. His thinks that it is 4 feet with the 6foot clearence is to the hot lines. I don't have a copy of the NEC book with me and tried to fing the info on the internet but all the sites wanted me to purchase a copy.
Thanks
Thanks