We want to run some conduit close enough to a pole base of a sign about 1.5'. We cant get any closer due to the fact that the foundation of sign wont let us get any closer. We want to install an LB above grade coming out of ground/concrete with rigid conduit from LB to sign laying flat on the ground.Does anyone see anything wrong with doing an installation this way?
Last edited: