Im looking at a set of plans with two commercial buildings on the same property approximatly 30 feet apart. Building A has two meter stacks mounted on it ( one for building A and one for building B ). Question # 1 Is this acceptable per code? And # 2 If it is since this B is a seperate structure would I have to supply a ground at every subpanel in building B ?