Hello,
I know there must be a thread on this somewhere but I can't find one. If someone can point me in the right direction I would appreciate it.
Residential 200A 1 Phase service
1 panel
#4 GEC from panel to well casing
Copper water pipes need to be bonded (not used as GEC)
250.104 says I can "bond to the GEC where of sufficent size"
I forgot to hit the copper water pipes on my way by with the GEC. Can I run #4 from the cold water pipe to the GEC or do I have to go all the way back to the panel?
Thanks,
Andy