Hi All,
When performing demo of a control system in an industrial settings, is it a common practice to test the system and check all the interface points before performing wiring demolition? This way the contractor is confidant that they are removing only wires/equipment that is associated with this system.
Thanks,
EE
	
		
			
		
		
	
				
			When performing demo of a control system in an industrial settings, is it a common practice to test the system and check all the interface points before performing wiring demolition? This way the contractor is confidant that they are removing only wires/equipment that is associated with this system.