Stevenfyeager
Senior Member
- Location
- United States, Indiana
- Occupation
- electrical contractor
I’m sorry, I’ve been reading the posts related to this topic but still unclear to me.
I have to run circuits in pvc to an outdoor kitchen before a concrete patio is poured.
Is 4” depth below the slab required?
I have to run circuits in pvc to an outdoor kitchen before a concrete patio is poured.
Is 4” depth below the slab required?
