We bid a 100kw Liebert UPS and have been asked to trim the bid. Owner asked me if we could loose the 400A 3? disco ahead of it. There are no EE drawings but I figured the disco in as the OCPD is above it on the next floor.
So I'm looking around the 05 NEC and can't find a requirement for a disco within site of a UPS.
What am I missing?
So I'm looking around the 05 NEC and can't find a requirement for a disco within site of a UPS.
What am I missing?