Is the disconnect before or after the meter? A meter disconnect is permitted by the NEC but not required. As stated the service disconnect rules are unchanged whether there is a meter disconnect or not.We have disconnect switch after Service meter of 480 V service. Is additional disconnect is required before service meter? as per NEC230.71(C)
Don’t really know, that’s what the poco engineer told me. Those services are not CT, so the meter is plug or bolt in, so I assume it is to make it safer for the meter to be installed, unenergized, hence the “cold” part.OK, thanks to all the knowledgeable folks here I now understand the difference between 'cold sequence metering' and 'hot sequence metering'............but WHERE did the term 'sequence' come from ??
Just curious !! THANKS !