Minuteman said:
About 80% of the time, we install a 6' cord and the rest of the time the GC has his boys do it. It plugs into the hot side of the duplex receptacle under the sink that is also the switched outlet for the disposal. Done it like a zillion times.
We have a close relationship with 2 GC companies. There is a few things that we do that is done out of consideration. I know - it's a old fashioned character trait that has become obsolete on the East & West costs, but out here in middle America, we sometimes do things out of kindness.
So, I'm supposed to install the cord on the dishwasher, disposal, and electric stove. But, sometimes GC does it if they are installing the appliances and are nice enough to save us a trip. And we do things for them too.
Like, swing by and unlock for somebody, or whatever. I might even pick up something at the big box for them while I'm there.
GC also calls us up and gives us T&M jobs on remodels. Also, they have a handful of well-to-do old customers in the nicer part of town that call the GC about every little thing, and GC calls us to handle the electric stuff. So, we go the extra mile for them - because they do things for us.
I know, it sounds weird to y'all, but it's called "customer relations" and we believe in it!