I have an application it is CL 1 Div 2 with several conduits that connect to j-boxes only Nema 4 X with distribution blocks, etc...
Are drains required in the vertical conduit drops, as in adding a tee with drain installed at the drops, I have seen both with and with out
Is this a code requirement or a matter of specific location
Thanks
Are drains required in the vertical conduit drops, as in adding a tee with drain installed at the drops, I have seen both with and with out
Is this a code requirement or a matter of specific location
Thanks