Alutiiq Eng
Member
- Location
- Charleston, SC
In order to install a NEMA 4X enclosure for surge protectors, we drilled two (2) holes in the side of a 2" LB and installed two (2) Myers hubs and two (2) 6 inch 3/4" rigid conduit stub outs. The conduit stub outs will have Myers hubs installed to connect to the NEMA 4X enclosure. 
 
I have researched the NEC and cannot find any reference to drilling LBs. Does this violate any NEC?s Articles? See below picture
	
		
			
		
		
	
				
			I have researched the NEC and cannot find any reference to drilling LBs. Does this violate any NEC?s Articles? See below picture
 
				
 
 
		 
 
		 
 
		 
	 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
	 
	