Singe Phase 3 wire Source from utility CO. to feed a meter and thus disconnect, The Disconnect neutral and ground rods are bonded together at disconnect This feeds a sub panel with separate neutral and ground points
The cell site has a ground ring with numerous ground rods. Do I Run ECG from disconnect to sub panel ? I have also seen where they tie sub panel grounding point to ground ring ? At what point do I have a parallel ground circuit.