livewireelectric
New member
- Location
- seattle, washington USA
can you have a 3 inch sleeve going through concrete and install (2) 100 amp feeder lines in 1 1/2 conduit through the 3 inch sleeve going into the crawl? Or are you just allowed to have one feeder line per sleeve. This is for a project in Seattle.