joeyww12000
Senior Member
- Location
- Chatsworth GA
when bonding a service you must bond in between the source and the first means of disconnect....correct? If I have a disconnect outside the building and a MDP with a main breaker inside then I would have to bond at the disconnect correct? Could I bypass the disconnect outside and bond at the MDP?